Lecture 7: Advanced Project Scheduling Techniques

Business & Economics - Lecture 7: Advanced Project Scheduling Techniques - 16 slides

By Sharon

Explore Lecture 7: Advanced Project Scheduling Techniques, covering This lecture focuses on advanced scheduling techniques in project management including the Critical Path Method (CPM).

Topics Covered

  • Introduction to Advanced Scheduling Techniques
  • Understanding the Foundations of CPM
  • Introducing Program Evaluation Review Technique (PERT)
  • Applications and Benefits of Advanced Scheduling Techniques
  • Step-by-Step Critical Path Method (CPM) Analysis
  • Advanced Applications of PERT in Uncertain Environments
  • Optimizing Schedules: Crashing and Fast Tracking Techniques
  • Using Software Tools for CPM and PERT Optimization
  • How Task Dependencies Impact Project Scheduling
  • Probability in PERT: Optimistic, Pessimistic, and Expected Time
  • Critical Path Method with Float: Free and Total Float Analysis
  • Advanced Resource Allocation in CPM and PERT
  • Analyzing Schedule Risks with Monte Carlo Simulations
  • Integration of CPM and PERT for Strategic Scheduling
  • Resource-Constrained Scheduling Models (RCS)
  • Conclusion: Synthesis of Advanced Scheduling Techniques

References

  • Kelley, J.E. and Walker, M.R. (1957) Critical Path Method: Resources allocation and project scheduling systems. Operations Research 5(5): 563-568.
  • Malcolm, D.G., Roseboom, J.H., Clark, C.E. and Fazar, W. (1959) Application of PERT. Journal of the Operations Research Society of America 7(4): 487-505.
  • Kelley, J.E. and Walker, M.R. (1957)
  • Malcolm, D.G. et al. (1959)
  • Lock, D. (2007) Project Management. 9th edn. Burlington: Gower Publishing.
  • Kerzner, H. (2001) Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 8th ed. Wiley.
  • Klastorin, T. (2003) Project Management With PERT: A Statistical Approach. Academic Press.
  • Lewis, J.P. (2007) Project Planning, Scheduling, and Control in Construction. Wiley.
  • Haimes, Y.Y. (2004) Risk Modeling Assessment and Management. Wiley.
  • PMI (2021) A Guide to the Project Management Body of Knowledge (PMBOK Guide).
  • Malcolm, D.G. et al. (1959) PERT system framework paper.
  • Kelley, J.E., and Walker, M.R. (1959) Critical Path Method framework.
  • Heerkens, G.R. (2015) Project management resource strategies.
  • Kroese, D.P., et al. (2014) Monte Carlo methods textbook.
  • Lock, D. (2020) Project Management. 11th edn. London: Routledge.
  • Moder, J.J., Phillips, C.R., Davis, E.W. (1983) Project Management with CPM, PERT and Precedence Diagramming. 3rd edn. Van Nostrand Reinhold.
  • Hajdu, M. (2013) Network Scheduling Techniques for Concurrent Projects. Springer Science & Business Media.
  • Kerzner, H. (2017) Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 12th edn. John Wiley & Sons.
  • Project Management Institute (2021) PMBOK Guide and Standards. 7th edn. Newtown Square: PMI.
Browse all lectures